BP was told of oil safety fault ‘weeks before blast’
A Deepwater Horizon rig worker has told the BBC that he identified a leak in the oil rig’s safety equipment weeks before the explosion.
Tyrone Benton said the leak was not fixed at the time, but that instead the faulty device was shut down and a second one relied on.
BP said rig owners Transocean were responsible for the operation and maintenance of that piece of equipment.
Transocean said it tested the device successfully before the accident.
Meanwhile, BP has said that its costs in tackling the disaster have now risen to $2bn (£1.34bn).
‘Unacceptable’
On 20 April, when the Deepwater Horizon rig exploded killing 11 people, the blowout preventer, as the device is known, failed.
Read more: http://blogs.myspace.com/blackqueenlara









